091-2230-8145     |      dataprojectng@gmail.com

DESIGN AND CONSTRUCTION OF A SINGLE PHASE AUTOMATIC CHANGE OVER SWITCH WITH PHASE SELECTOR

  • Project Research
  • 1-5 Chapters
  • Abstract : Available
  • Table of Content: Available
  • Reference Style: APA
  • Recommended for : Student Researchers
  • NGN 3000

INTRODUCTION

Change over switch is a device used to switch off a power supply and subsequently switch on another power source. Basically it is aimed at switching on a more convenient power supply to the load. Since it switches on power to the load precaution has to be taken while choosing the type of change over switch. Also size, arcing control are put into consideration in the choice.

          A good switch should be the one whose contact is made in such a way as to limit the arc formation by having no contact-bounce and by having contacts made of good conductive, corrosion resistance and wear resistance materials.

          A good change over switch must have adequate insulation and must be so constructed and located as not to constitute a potential hazard.

          A good change over switch should also have tight contacts so as to limit or eliminate the possibility of partial contacts at the contact point. The partial contact lead to overheating of the components and may lead to fire outbreak.

 

1.2    Aims and Objectives

Due to inconsistent supply of power, there is a growing need for an alternative source of power supply. This has led to heavy capital investment in a bid to curb power failure and ensure regular power supply for our industries, hospitals and homes. The problem of power failure can be checkmated with the use of standby generating set.

An Engineering author Tony Rudk Inn said in his book titled "Upgraded signal source with improved performance and reliability" that the cost and depreciation associated with breakdown vary from one application to the other, and in some cases, the user has little choice but to ensure that a stand-by unit is available to take over on event of failure of primary system.

          If some of these big firms do not make provisions for stand-by power source, frustration could set in which may lead to the closure of business and thus throwing workers into unemployment. Also in the case of hospitals undergoing a surgical operation and the power supply suddenly goes off, the patient might loose his life due to power outage.

          Furthermore, if the President of the country is making a nation wide broadcast and all of a sudden there is power failure in the transmitting station, it would be viewed as an attempt to sabotage the government ruling and some people must go for it.

          Sequel to the rate at which more sophisticated electrical/electronics gadgets are being procured an installed in our homes, hospital and business premises, there is a justifiable need for a faster and more reliable change over system in an event of power outage.

          In view of these considerations, this project is aimed at designing and constructing a workable automatic change-over switch with phase selector circuit which switches on the load from National Electric Power Authority (NEPA) to a generator when power comes back. Also when there is a phase failure in any of the NEPA phase carrying the load, the change-over switch will be changed to alternative phase.




FIND OTHER RELATED TOPICS


Related Project Materials

EFFECT OF CORONA VIRUS ON GLOBAL ECONOMY

BACKGROUND OF THE STUDY

At present the new name of fear is Coronavirus disease (COVID-19). This is not only killing the...

Read more
THE ROLES OF THE CENTRAL BANK IN STABILIZING A DEPRESSED ECONOMY

ABSTRACT

This study on the role of Central Bank in stabilizing a depressed economy was designed with the objectives of a...

Read more
INFLUENCE OF MEDIA CREDIBILITY ON NEWS CONSUMPTION AMONG CIVIL SERVANTS

ABSTRACT

The research is on the thrust to examine the effect of media credibility on news consumption among civil servan...

Read more
DEVELOPMENT OF TOTAL QUALITY MANAGEMENT MODEL FOR SMALL AND MEDIUM SCALE CONSTRUCTIION FIRMS IN SOUTH-EAST NIGERIA

Statement of the Problem

Over the years, SMCFs in Nigeria have recorded a low level of participation and have often been sidelined in lar...

Read more
BACTERIOLOGICAL ANALYSIS OF WATER IN HALLS OF RESIDENCE IN UNIVERSITY OF BENIN

ABSTRACT

This study was carried out to examine bacteriological analysis of water in halls of residence in University of...

Read more
HEPATITIS C VIRUS AMONG PREGNANT WOMENPEOPLE LIVING WITH HIVAIDS ATTENDING CLINIC AT UNTH ITUKUOZALLA

ABSTRACT

A total of 50 blood (30 pregnant and 20 HIV) samples were obtained from pregnant women and PLWHA attending clinic at UNTH Ituku-...

Read more
THE INFLUENCE OF ACCOUNTING INFORMATION TOWARDS DECISION MAKING IN MANUFACTURING FIRM

Abstract

Information is a life-wire of every business organization. However, it is of various diversities, but accounti...

Read more
MARITIME SECURITY AND INFORMATION AND COMMUNICATION TECHNOLOGY

Abstract

The maritime industry is a global transporter of the goods of modern globalized economies. Shipping plays a vit...

Read more
THE IMPACT OF EFFECTIVE PLANNING ON TEACHING AND CURRICULUM DEVELOPMENT ON TEACHING AND LEARNING OF INTEGRATED SCIENCE

 

ABSTRACT

This study was carried out  to examine the impact of effective planning on teaching and c...

Read more
APPLICATION OF INFORMATION AND COMMUNICATION TECHNOLOGIES (ICTs) TO MANAGEMENT OF LIBRARY INFORMATION RESOURCES IN SELECTED NIGERIAN FEDERAL UNIVERSITY LIBRARIES

ABSTRACT

Digital media have revolutionized information sources and advances in Information and Communication Technologies (ICTs) and have...

Read more
Share this page with your friends




whatsapp